| Engineering and Permit Department |
| BUILDING PERMITS |
| The construction of a building over 100 square
ft. including mobile homes not in a flood plain |
THE
PERMIT FEE IS $25.00
The requirements needed to obtain the permit are:
- Legal description of the property
- Size of building or mobile home
- Number of bedrooms
- Year of mobile home
- Value of building or mobile home
|
| The construction of a building over 100 square
ft. including mobile homes in the flood plain |
THE
PERMIT FEE IS BASED ON $0.07 PER SQUARE FT. OR MINIMUM OF $50.00
The requirements needed to obtain the permit are:
- The same requirements listed in the above 1
through 5
- Must have elevation certificate
- If building is the flood way a no-rise
certificate is also attached to the elevation certificate
|
| SEPTIC PERMIT |
THE
PERMIT FEE IS $200.00
The requirements needed to obtain the permit are:
- The same requirements listed in the above 1
through 5
- All septic system job sites must have a site
evaluation performed before installation
- If someone is compensated in any part of
installation they must be licensed by the TCEQ.
- All systems must be installed according to the
TCEQ requirements (Chapter 285 rules for on-site sewer facilities)
|
| WATER WELL |
|
The office keeps a supply of water sample bottles
with information on the labs that take the samples
|
| FLOODPLAIN MAPS |
|
The office will verify if property is located in a
floodplain according to the flood insurance rate maps
|
| SUBDIVISIONS |
|
All new subdivision plats and other requirements
for subdivisions must be submitted through the permit department.
|